May – Jun 2024
Completed
City Supermarket
Design, supply and installation of a 30 kW and 45 kWh hybrid system.
Design, supply and installation of a 30 kW and 45 kWh hybrid system.
Design, supply and installation of a 30 kW and 45 kWh hybrid system.
Design, supply and installation of a 30 kW and 45 kWh hybrid system.
Partner with MAS for engineering design, energy and water solutions, technical advisory, research, and innovation.