Request a Proposal
Project reference

Abokor Business Park

Design proposal for a 50 kW hybrid inverter system with 70 kWh battery storage.

Jan 2025 Design proposal

Abokor Business Park

Design proposal for a 50 kW hybrid inverter system with 70 kWh battery storage.

50 kW · 70 kWh Location on request Energy Engineering

Design proposal for a 50 kW hybrid inverter system with 70 kWh battery storage.

Let’s Engineer Sustainable Solutions Together.

Partner with MAS for engineering design, energy and water solutions, technical advisory, research, and innovation.